Blackheath, London
Reliable
Transparent
Friendly
Approved Installers
PROBLEM: A render system was required to be applied to render carried board.
SOLUTION: A lightweight render system was the best solution for this project as it is more flexible and would bond well to the render carrier board. The client decided to go with the K Rend Thin Coat System.
JOB SIZE: 200m2