Removing render and re-rendering is a great way to remove old and tired render and re-applying it to make the walls of your property to look nice. It is as simple as it sounds. The costing of this will be to remove render and re-render. Re-rendering can cost anything between £40-£80/sqm and removing the render can cost between £15-£44/sqm.

Another way to make the walls look good is to restore the brickwork. Compared to re-rendering, restoring the brickwork may include many things such as jet-washing the brickwork and re-pointing the mortar in order to make the wall look good. This means that not only will there be a cost to remove the render, there may be a number of other costs in order to restore the brickwork. The cost of removing the render here will stay the same (£10-£45/sqm). The cost to jet-washing walls can cost anywhere between £100 and £350, whereas re-pointing the mortar in the brickwork as well as restoring the brickwork can cost anywhere between £30-£120/sqm depending on what is required.

When we compare the cost of a standard semi-detached house at 120m2 we can see the costing:
Render removal and re-rendering = £7,200.00-£14,880.00
Restoring the brickwork = £7,900.00-£20,150.00

To restore the brickwork will not be cheaper than re-rendering with a typical 120m2 semi-detached house and brickwork can look good when fully restored, However, by paying the extra for re-rendering, you are also getting protection against the elements and render doesn’t have to be as maintained as brickwork. Short term, restoring the brickwork is the better option. Long term, re-rendering is the cheapest option.

The simple answer is yes. There are many ways that a company can underestimate rendering.
Firstly, they do not hire qualified staff. Getting the right people to do the rendering is vital as there is a misconception on how easy rendering is. The idea is that render can be thrown onto a wall within a day and it is done. However, this is not the case and rendering has to be done in stages. For example, K-Rend TC15, starts off by install beading and applying the basecoat. Full reinforcement mesh is installed between two layers of basecoat. This is left to cure for 14 days before the final coat is applied. This shows that a rendering system is not easy, especially when external factors such as the weather, affect the duration of the rendering works. This leads onto the next point.

They do not check the specification. The specification is very important as it contains some valuable information such as the application process and details about the system. This makes it more important that construction companies, who are not necessarily render trained, read the specification so they understand the system. If they don’t, then it can only be a recipe for disaster and most systems which need to be re-done are either done by a poor renderer or a builder who doesn’t have a clue what he is doing.

Another reason is that they rush the rendering works in order to finish the job quicker. The rendering process can be the last stage to completing a new build or even a refurbishment. This means that less time may be spent on the rendering as the construction company would want to wrap up their work as quickly as possible. The role of the render is to protect the house from the extreme weather outdoors and sometimes even insulate a house, so needs to be done properly. Going back to the first two points, qualified staff and the specifications would know how long to spend on a particular system. For example: how long it takes to cure. Construction companies normally have specific trades such as electricians and bricklayers, but not always renderers, so other trades who are sent to do the works have little idea about external rendering.

When a construction company does not hire qualified staff to do the rendering works, they underestimate it. They do not check the specification because they think the system is really easy to apply and by not checking the specification, they do not know how long as system should take. The work may end up being done poorly, which may lead to problems in the near future.

When deciding on whether or not to render your property cost is always a major factor. Rendering a property is not always the cheapest option short term however long term it is probably the best option. The rendering prices vary due to the following factors;

Quality of the workmanship – a high standard rendering company is going to be slightly more expensive than your local builder, the reason for this is because they value their work and they offer guarantees with it too. We spend a lot of time repairing or re-rendering properties which were not rendered properly in the first place. The client ends up paying a lot more money in the end because they were initially trying to save by going with their local builder. Rendering nowadays is a specialist trade which requires a lot of knowledge and training.

Size of the project – As with all projects, a terraced property will always cost less then a semi-detached property or a detached one. For a bigger project more labour time is required, more materials are required and the scaffolding costs will also be greater.

Product – Certain rendering products are cheaper then others, so that is something to consider when deciding. It is also the case that some rendering companies work with certain rendering products as they have agreements in place with the product manufactures. This is something you should ask the rendering representative about.

Nature of project – The final factor when it comes to price is what you want done to your property. For example if you currently have rendering already installed on the property and you want that removed due to cracks then that will probably cost more then to apply the render straight to a brick work or block work.

 

 

Lets discuss
do you have any questions? contact us via email or complete the ENQUIRY form.