Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sandbox/wp-includes/functions.php on line 6131
Westminster Cathedral – ExternalRendering

PROBLEM: The brickwork on the parapet wall on the roof was very old and water was penetrating into the building

SOLUTION: Mechanically fix stainless steel rib lath and render with K Rend Hydraulic Lime. The reason lime render was used in this project instead of traditional sand and cement render was because the mortar of the brickwork was made out of lime due to the old age of the building. If sand and cement render was used the lime may have reacted with the cement which may have caused the render to crack. This render was left unpainted.

JOB SIZE: 250m2

YEAR: 2014

Lets discuss
do you have any questions? contact us via email or complete the ENQUIRY form.
EMAIL ADDRESS
info@externalrendering.net
ADDRESS
Unit 114, 313 Billet Road, UK E17 5PX
CALL US
020 8531 6361

    [spam_fix]